OVERVIEW

At ICF Bondmor, we were called in to accelerate progress on the Holly Road project, focusing on key structural elements while incorporating bespoke detailing throughout. We managed the ICF walling, metal deck intermediate floor slabs, and roof structure, ensuring each element was installed with precision.

In addition, we applied custom detailing to ensure the finishes met the luxury standards of the development. Our attention to detail not only reinforced the structural integrity but also enhanced the visual appeal, making sure every aspect aligned with the project’s high-end vision. This combination of craftsmanship and customisation helped the project stay on track and set a new benchmark in luxury living.

During the Holly Road project, access for concrete wagons posed a challenge due to the site’s layout. To address this, we worked alongside Macfarlane Concrete Pumping contractors, developed an innovative solution involving roughly 100 meters of line pump from the roadside. This line pump transported the concrete down to the site, where it was connected to a boom pump that then pumped the concrete up and over into the ICF formwork. This collaborative and creative approach allowed us to overcome the access issue efficiently while maintaining the quality and progress of the project.

PROJECT

Luxury living with sleek design and cutting-edge craftsmanship. Expansive, elegant, and built to impress, it’s the ultimate statement in modern living.

DETAILS
  • Project Duration: 100 days.

  • Contract: Standard Terms.

  • 280 m2 of Piled Insulated Raft Foundation.

  • 1110 m2 of ICF walling constructed.

  • 385 m3 of concrete poured.

  • 560 m2 of Metal-Deck Intermediate Floor.

  • c. 50 tonnes of excavation.

  • Type ‘A’ waterproofing.