PROJECT

Olicanian Cricket Club.

Olicanian Cricket Club.

Clubhouse Revival.

Clubhouse Revival.

OVERVIEW

In a remarkable tale of resilience and community spirit, the Olicanian Cricket Club in Ilkley has risen from the ashes after a devastating arson incident. With the unwavering support of Bondmor, the club has been reborn, showcasing cutting-edge construction techniques and a renewed sense of purpose.

For privacy reasons Vimeo needs your permission to be loaded. For more details, please see our Privacy Policy.
I Accept
WHAT WE DID

ICF Walling with Exceptional Thermal Efficiency:

The heart of the new Olicanian Cricket Club beats within its walls—walls built with a modern twist. Incorporating 222m2 of ICF (Insulated Concrete Form) walling, each block not only signifies stability but also boasts a remarkable 0.15 U-value, ensuring exceptional thermal efficiency. This design choice guarantees an environment that is both comfortable and energy-efficient, offering players and spectators an unmatched experience.

The Majestic Apex ‘Shark Fin Ridge Line’:

Elevating the club’s aesthetics, a grand apex ‘shark fin’ ridge line graces the skyline. This distinctive architectural feature not only symbolises the triumphant resurgence of the club but also creates an iconic landmark within the community. The apex’s sleek lines pay homage to the club’s legacy while embracing its future.

Reinforced Concrete Walls:

The project also integrates 33m3 of reinforced concrete walls, a testimony to the structural integrity and safety of the new Olicanian Cricket Club. This addition is a testament to the club’s commitment to providing a secure and reliable venue for players and supporters alike.

15 Days of Transformation:

The reimagining of the Olicanian Cricket Club was no ordinary feat. In a mere 15 days, the club’s resurrection took shape—swift, efficient, and focused. This remarkable turnaround showcases the dedication of the team, underscoring their commitment to not just restoring the club but revitalising its spirit.

The reimagined club, with its ICF walls, iconic apex, and resilient spirit, is more than just a venue—it’s a symbol of unity, determination, and a love for the game.

CLIENT

“On behalf of Olicanian Cricket Club, I wish to express our sincere gratitude and satisfaction with the exceptional work undertaken by Bondmor Building Services in the reconstruction of our new pavilion, particularly with the innovative use of insulated concrete formwork.

From the inception of this project, we were determined to create a modern, sustainable, and energy-efficient facility that would not only serve our club but also be a testament to our commitment to the local community and environment. Bondmor understood this vision and played a pivotal role in making it a reality, working alongside the Main Contractors to deliver the project.

The implementation of insulated concrete formwork was a game-changer for our project. It not only expedited the construction process but also significantly enhanced the energy efficiency and thermal performance of our pavilion. The result is a facility that is not only aesthetically pleasing but also environmentally responsible and cost-effective to maintain.

The benefits of this innovative approach were evident from the outset. The superior insulation provided by the insulated concrete formwork has translated into consistent indoor temperatures, reducing our reliance on heating and cooling systems. This not only lowers our operational costs but also aligns with our commitment to reducing our carbon footprint.

Moreover, the dedication and professionalism exhibited by the Bondmor team throughout the project were commendable. Their attention to detail, adherence to timelines, and transparent communication were critical in ensuring the success of this endeavour.

Our new pavilion has become a source of pride for our club and a valuable asset for our community. It stands as a testament to the synergy of vision and expertise that Bondmor brought to the table.

In conclusion, we wholeheartedly endorse Bondmor for their exceptional work in implementing insulated concrete formwork for the reconstruction of our new pavilion. We have no hesitation in recommending their services to anyone seeking top-tier construction solutions delivered with integrity and innovation.

Thank you once again for your outstanding contribution to our club’s success.”

Stephen Bailey
PROJECT

The Olicanian Cricket Club in Ilkley has risen from the ashes after a devastating arson incident. With the unwavering support of Bondmor, the club has been reborn.

DETAILS
  • Project Duration: 15 days.

  • 222 m2 of ICF walling constructed.

  • 33 m3 of concrete poured.

LINKS
GALLERY